
ELEVATOR MODERNIZATION
ELECTRICAL . HVAC . FIRE ALARM . GENERAL CONTRACTING
Every elevator modernization project requires additional building systems to be brought up to current codes and standards. Stewart Electrical handles everything needed as an all-inclusive elevator “Work by Others” (WBO) contractor, including Electrical, HVAC, Fire Alarm, and General Contracting. Our dedicated and experienced Elevator Modernization Teams ensure that work is completed within the Elevator Contractor’s timeframe /schedule—Saving costly elevator mechanic standby time.
RELATED WORK BY OTHERS:
Important Code Requirments &
How “Turn-Key” Contractors Can Help
Slide Presentation by Colby Bruce / Master Electrician / Operations Manager
SELECT ELEVATOR CLIENTS
ELEVATOR MODERNIZATION SERVICES
-
MACHINE ROOMS
Main Line Disconnects
Shunt Trip Systems
LED Lighting & Emergency Lighting
HVAC Split Systems
Fire Alarm & Elevator Recall Systems
Sprinkler Systems
Fire-rated Walls & Ceilings
Fire-rated Entry Doors
Steel Platforms and Stairs
Equipment Access Hatches
Code Updates
-
ELEVATOR HOISTWAYS
Fabricate New Hoistways
Fireproofing
Sprinkler Systems
Smoke & Heat Detectors
Code Required Ventilation
-
ELEVATOR PITS
Electrical
LED Lighting & GFCI Receptacles
Cleaning and De-greasing
Waterproofing & Water Removal
Sumps and Sump Pumps
Ladders and Access Platforms
Smoke & Heat Detectors
-
REPAIRS
You can count on us for expert services for elevator WBO repair services and modifications.
There’s no job too big or small.
We know how to get the job done right—on time and on budget.
ELEVATOR MODERNIZATION PROJECTS
CAMBRIDEGPARK DRIVE, CAMBRIDGE, MA
BEFORE
AFTER
BUSINESS PARK, PROVIDENCE, RI
BOSTON, MA
Flying up a new PELV Ventilation unit for an Elevator Modernization project that we are teamed up with Delta Beckwith Elevator on.
LOCAL HEALTHCARE FACILITY
When a local healthcare facility needed an exhaust fan installed for 524 CMR Compliance in their elevator hoistway, they knew who to call! Stewart Electrical Contracting, Inc. managed the entire installation which had to take place on off-hours to minimize patient impact. We organized 7 separate trades, Electrical, Pipe-Fitters, Sheet-Metal, Elevator, Fire Alarm and Fire Protection, 4 in-house and 3 subcontractors to ensure a seamless installation. Thank you to our in house International Brotherhood of Electrical Workers, Local 103 Electricians, Local 17 Sheet Metal workers, and Local 537 Pipefitters, and Local 339 Carpenters for making this job happen. Special shout out to Cleary Elevator for providing the elevator mechanic, and 2 other contractors for their involvement. Job well done!
THE LEWIS WHARF, BOSTON, MA
ELEVATOR MODERNIZATION & HVAC WORK
DARTMOUTH HITCHCOCK HOSPITAL, LEBANON, NH
TUFTS MEDICAL CENTER, BOSTON,MA
ELEVATOR MODERNIZATION & HVAC
JEWELERS BUILDING, 333 WASHINGTON STREET, BOSTON
WELLESLEY OFFICE PARK, WELLESLEY, MA
Elevator Modernization Project: Load Center Installed and wired.
THOMAS O’MALLEY BUILDING, MANCHESTER, NH
400 ATLANTIC AVENUE, BOSTON, MA
BUSINESS IN ROSLINDALE, MA
Elevator modernization showcasing a Mitsubishi ductless, split heat pump;
installation, and power for elevator, machine room, and fire alarm recall modules.
SOMERVILLE HOUSING AUTHORITY, MA
HOSPITAL IN FALL RIVER, MA
27 PAGE TERRACE, STOUGHTON, MA
ELEVATOR MODERNIZATION:
Ductless split Heat/AC unit installs for elevator machine room.
